Wednesday, September 10, 2014

Home construction, part XI

October 6, 2013: More painting continues. The master bedroom ceiling is complete.

October 11, 2013: A lot has been going on in the common areas. The lighting is up above the kitchen island.

The desks are in place in the keeping room. Eventually there will be a hutch between the two windows:


The fireplace surround, with slate in place:

More cabinetry is in place in the kitchen:

The oven and microwave are installed. Only the microwave trim is missing. Backordered!


The landscapers have been busy too!



The sod is being laid in the back yard.

October 12, 2013: Pretty rose bushes, next to the driveway on the side of our house. We look forward to lots of color in the future.

The gaps in the sod is the future location of our veggie patch. There is always room for home grown produce!

And on the inside of the house, Safa's room is almost complete:

The master tub in place:

Most of the remaining work is electrical or plumbing related, such as the lighting and bathroom fixtures. Of course, they can't be installed and completed until the vanities are all in place.