Monday, March 3, 2014

Home Construction, part VIII

We are now into the middle of September, and the exterior of the house looks almost complete.

September 17, 2013: The shutters are up and ready to be painted.


The bathroom window on the side of the house with the siding up around it:

 The side driveway is prepped and ready for the concrete to be poured:


And inside the house, the sheet rock is completed, with nice rounded edges. The next step will be laying the hardwood.


September 20, 2103: The hardwood has been laid throughout the lower level and some of the upstairs too. Can't wait to see how it will look once it's stained.

The side driveway is completed.


Now the circular driveway at the front of the house is ready to be poured too:

September 23, 2013: The open part of the deck, which is just outside the master bedroom

The front driveway has been poured too:

And inside the house there is more work on the carpentry. A lot of the trim has been installed.


The interior doors are up throughout the house.

Tomorrow we'll be back to meet with the carpenter about the built-in bookcases.