Tuesday, February 11, 2014

Home Construction, part V

August 28th, 2013: Brick on the side of the house, around the garage doors, and over the garage.

And the back of the house is also starting to look 'done'. This is under the deck:

The lower door is where the basement opens out into the back yard, and the upper one (white) will open from the hearth room into the screened porch.

Of course, there is work going on simultaneously inside the house. This is where the master bathroom shower will be. Don't want any leaks!


And more from the inside, these are the French doors in the master bedroom, that open on to the open potion of our deck. It will be lovely to have the privacy of the woods while still a pretty view from the bedroom:


And electrical work has started upstairs:

August 31st, 2013: The garage door is up.

And here is Safa standing in her future bedroom. Picture orange walls. Behind her is the recess we designed for her desk. Since her room is the smallest bedroom, we wanted to give her a little more space, while being able to accommodate the full size bed she wants.